Office Building

Developer: Primelands (Johnny Chami – Executive Manager)
Architect: Ronald Baz / Sahar Corab
Concrete Design: TEG
Builder: Prime Contracting (Johnny Chami – General Manager)
HVAC, Electrical, & Plumbing Design: Prime Contracting

 

Building Description

  • Total area 30,000m2
  • 6 underground parking floors (5000m2 each)
  • 1 ground floor +mezzanine (3500m2)
  • 10 floors above ground (2500m2)
  • Controlled access to visitors and Tenant
  • Separate access to the parking’s for visitors and tenants

 

Building Engineering Features

  • 5000 m2, Raft 1.2m deep, supported on piles
  • 214 piles working under tension and compression
  • Permanent diaphragm walls; 32m height
  • Water level at 1.5m below ground
  • 8.8m minimum clear spans between columns to optimize the number of cars in the parking
  • Composite beams supporting facades to eliminate medium and long-time deflection (curtain glass cracking)
  • Dicain v5 VRV air conditioning system
  • Air-conditioned underground parking

 

Architectural Features

  • Flexibility for potential tenants to lease shell and core space from 250m2 to 2500m2 per floor.
  • Openings in the slab to account for any location of the restrooms/
  • Open dome
  • Very sophisticated internal decoration, to accommodate for the highest equipment of VIP corporations.